St David’s 2 Shopping Centre
A Project Case Study

“St David’s 2” Shopping Centre

Question 1. Draw a project network diagram of this project. Determine the shortes

t time to complete the project. Identify the critical activities.
Task ID A B C D E F G H I J Task Description Planning and Consultation Service Diversions Highways Enabling Appoint Main Contractor CPO Inquiry Obtain Government Approval Construct John Lewis Store Demolition Main Scheme Construction Refurbishment of St David’s Centre Duration (Months) 9 9 3 3 3 3 24 12 30 30 Cost (?Millions) 12 15 10 4 12 2 36 80 210 50 Precedence A B A A E C, D, F C, D, F H C, D, F

K
L M N O P Q

Library Construction
John Lewis Fit-out Main Scheme Fit-out Library Fit-out Residential Homes Public Realm Opening

21
15 3 12 12 3 3

70
9 25 16 92 28 4

C, D, F
G I K H I L, M, N

Project Network Diagram

Activities A, B, C, H, I, M and Q are critical. The project duration is 69 months. Question 2. Convert the project diagram in a Gantt Chart. Schedule the non-critical activities as late as possible.

Gantt Chart

Question 3. Determine the most cost effective way to complete this project within 56 months given the following information
Task ID A B C D E F Task Description Planning and Consultation Service Diversions Highways Enabling Appoint Main Contractor CPO Inquiry Obtain Government Approval Normal Duration (Months) 9 9 3 3 3 3 Normal Cost (?Millions) 12 15 10 4 12 2 36 80 210 50 70 9 25 Crash Duration (Months) 6 2 12 10 24 18 14 9 2 Crash Cost (?Millions) 21 15 -

G
H I J K L M

Construct John Lewis Store
Demolition Main Scheme Construction Refurbishment of St David’s Centre Library Construction John Lewis Fit-out Main Scheme Fit-out

24
12 30 30 21 15 3

60
94 270 68 105 15 50

N
O P Q

Library Fit-out
Residential Homes Public Realm Opening

12
12 3 3

16
92 28 4

6
6 2 -

22
122 35 -

Crash cost ? Normal cost Cost to crash by one period = Normal time ? Crash time
Task ID A B C D E F G H I J K Normal Duration (Months) 9 9 3 3 3 9 24 12 30 30 21 Normal Cost (?Millions) 12 15 10 4 12 2 36 80 210 50 70 Crash Duration (Months) 6 2 12 10 24 18 14 Crash Cost (?Millions) 21 15 60 94 270 68 105 Crash to cost by one month 2 5 2 7 10 1.5 5

L
M N O P Q

15
3 12 12 3 3

9
25 16 92 28 4

9
2 6 6 2 -

15
50 22 122 35 -

1
25 1 5 7 -

Step 1. St David’s in 68 months
Crash activity B one period to 8 periods for a cost of ? 2M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 68 months.

Step 2. St David’s in 67 months
Crash activity B one period to 7 periods for a cost of ? 2M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 67 months. The accumulated project crash cost is now ?4M.

Step 3. St David’s in 66 months
Crash activity B one period to 6 periods for a cost of ? 2M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 66 months. The accumulated project crash cost is now ?6M.

Step 4. St David’s in 65 months
Crash activity C one period to 2 periods for a cost of ?5M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 65 months. The accumulated project crash cost is now ?11M.

Step 5. St David’s in 64 months
Crash activity H one period to 11 periods for a cost of ?7M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 64 months. The accumulated project crash cost is now ?18M.

Step 6. St David’s in 63 months
Crash activity H one period to 10 periods for a cost of ?7M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 63 months. Activity H was crashed one period to 10 periods for a cost of ? 7M. The accumulated project crash cost is now ?25M.

Step 7. St David’s in 62 months
Crash activity I one period to 29 periods for a cost of ? 10M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 62 months. The accumulated project crash cost is now ?35M.

Step 8. St David’s in 61 months
Crash activity I one period to 28 periods for a cost of ? 10M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 61 months. The accumulated project crash cost is now ?45M.

Step 9. St David’s in 60 months
Crash activity I one period to 27 periods for a cost of ? 10M.

Activities A, B, C, H, I, M and Q are critical. The project duration is 60 months. The accumulated project crash cost is now ?55M.

Step 10. St David’s in 59 months
Crash activity I one period to 26 periods for a cost of ? 10M.

Activities A, B, C, H, I, M, Q, G and L are critical. The project duration is 59 months. The accumulated project crash cost is now ?65M.

Step 11. St David’s in 58 months
Crash activity I one period to 25 periods for a cost of ? 10M and crash L one period for a cost of ?1M.

Activities A, B, C, H, I, M, Q, G and L are critical. The project duration is 58 months. The accumulated project crash cost is now ?76M.

Step 12. St David’s in 57 months
Crash Activity I one period to 26 periods for a cost of ?10M and crash L one period for a cost of ?1M.

Activities A, B, C, H, I, M, Q, G and L are critical. The project duration is 57 months. The accumulated project crash cost is now ?87M.

Step 13. St David’s in 56 months
Crash activity M one period to 2 periods for a cost of ? 25M and crash L one period for a cost of ?1M.

Activities A, B, C, H, I, M, Q, G and L are critical. The project duration is 56 months. The accumulated project crash cost is now ?113M.

The crash cost – project duration trade-off


更多相关文档:

甘特图制作步骤

如果你也想知道如何在一分钟之内利用 excel 图表功能作出甘特图来, 请花几分钟看完这篇文章: 这是完成的样子: 首先,你要输入进度数据,如下图 然后,启动图表...

绘制甘特图的步骤

Excel 并未提供甘特图类型, 但还是可以绘制甘特图的, 方法就是通过对堆积条形图类型进行自定义,使之显示任务、任务工期和层次 通过对堆积条形图类型进行自定义, ...

project简易操作流程图

project简易操作流程图_计算机软件及应用_IT/计算机_专业资料。project2003简易操作...图示。 此时在甘特图中出现一个连接线代表所选择的第一个任务完毕后才会进行第...

甘特图和工作流程图1

甘特图和工作流程图1 构建博客时,分配任务的结果图。构建博客时,分配任务的结果图。隐藏>> 题组组组 目: 长: 分组图、 分组图、甘特图和个人任务书 冶凤青 ...

甘特图与网络图

甘特图与网络图甘特图(Gantt chart)又叫横道图条状图(Bar chart)。它是在第一...网络图是用箭线和节点将某项 工作的流程表示出来的图形。根据绘图表达方法的不...

学生寝室管理系统甘特图和网络图

实验五:项目历时估算,甘特图和网络图开发学生宿舍管理系统, 首先要做的就是项目...它其中包括模块结构图的设计、 系统流程图的设计和物理配置等。最后,是大环境下...

活动项目执行流程图

活动项目执行流程图_工作总结/汇报_总结/汇报_实用文档。活动策划执行流程人员...5 标准管控工具:甘特图表任务:把活动管理各个区域的工作分解成为一个个易于管理...

project--甘特图编制流程及软件中疑问解答

( 5) 更改甘特条形 图的 颜色、形状或图案若要使甘特图视图上的任务条形图( 例如 ,里程碑或摘要任务 )引人注意 ,您可以更改它 们的颜色、形状或图案,以将...

工作计划甘特图

保安补贴签批 对保安进行门禁管理制度与客户接待流程的考试 每天早上 8:30 分...的空白甘特图,请您制定出下一周的个人工作计划,并试着用这个甘特 图来评估计划...

活动项目执行流程图 经典

活动项目执行流程图 经典_总结/汇报_实用文档。活动策划执行流程项目接洽项 目接...标准管控工具:甘特图甘特图表 甘特任务: 任务:把活动管理各个区域的工作分解...
更多相关标签:
甘特图 | 甘特图模板 | 甘特图软件 | excel 甘特图 | 甘特图 项目管理 | 甘特图在线 | 甘特图怎么做 | 甘特图软件免费下载 |
网站地图

文档资料共享网 nexoncn.com copyright ©right 2010-2020。
文档资料共享网内容来自网络,如有侵犯请联系客服。email:zhit325@126.com